Flooring Installation Done Right Since 2004

Call (847) 361-0099 Today!

Real Wood, Laid Tight and Square

Hardwood Flooring Installation in Glenview, IL

Solid hardwood can last for decades when it goes down right. Quality Installs has installed floors since 2004, and every installer on the job is licensed, bonded and insured.

Glossy red oak hardwood floor
  • 5.0
    Google rating from 11 reviews
  • Since 2004Family-owned and operated
  • 2,500+Projects completed
  • Licensed, bonded and insured
    Maximum general liability and workers’ comp

Solid and Engineered Hardwood, Installed to Last

Hardwood is the floor most people picture in a finished home. It's warm underfoot, it suits almost any style, and solid boards can be sanded and refinished down the road instead of replaced.

How long a hardwood floor lasts depends a lot on the install. The subfloor has to be flat and solid, the wood has to match the moisture level in your home, and every board needs room to move with the seasons.

Bob Leibrandt founded Quality Installs in 2004 and still runs it. We're a family-owned flooring company in Glenview with more than 2,500 projects completed and installers who bring over 100 years of combined experience. Bob's story tells how it all started.

Dark hardwood floor meeting a stone fireplace hearth

What Hardwood Installation Includes

  • Measuring and Layout

    Every job starts with measuring the rooms and planning the layout, including which way the boards run and where transitions fall. On a nail-down floor, running the boards across the floor joists gives them the strongest support.

  • Moisture Readings

    Wood swells and shrinks with humidity, so the subfloor and the boards both get checked with a moisture meter before installation. National Wood Flooring Association guidelines call for the subfloor to read no more than 4 percentage points above strip flooring, or 2 points above planks 3 inches and wider.

  • Nailing Down the Boards

    Solid hardwood is nailed through the tongue of each board into a wood subfloor, over an underlayment such as roofing felt. End joints are staggered so the seams don't line up and the floor looks natural.

  • Trim, Transitions and Cleanup

    Hardwood needs a gap at the walls to expand into, and trim covers it. Transitions finish the edges where the new floor meets tile, carpet or another room, and the job wraps up with cleanup and a walkthrough.

Choosing a Hardwood Species

The species sets the color, the grain and how well the floor holds up to wear. Hardness is measured on the Janka scale, where a higher number means a harder wood.

  • Red Oak

    Red oak has a bold grain with red and rust undertones, and it averages around 1,290 on the Janka scale. It's a classic that fits rustic, traditional and modern rooms alike.

  • White Oak

    White oak is a bit harder, at around 1,360, with a tighter grain and grayish-brown undertones that work with warm or cool finishes. It's a durable pick for active households.

  • Hickory

    Hickory averages around 1,800, well above either oak, and its boards swing from light to dark with natural knots. It suits rustic and natural styles and stands up well to kids and pets.

Subfloor and Site Prep for Hardwood

A hardwood floor is only as good as what's under it. The subfloor should be plywood or OSB that's dry, fastened tight and flat to within 3/16 inch over 10 feet. Loose panels get screwed down first, since subfloor movement is the top cause of squeaks in nail-down floors, and we level any spots that aren't flat.

Solid hardwood isn't made for below-grade rooms, so basements are better suited to vinyl plank installation. On a concrete slab at or above ground level, the installation method changes and the concrete needs a moisture test first.

The house should be at normal living conditions before the wood arrives, with the heat or air conditioning running. You don't need to clear the rooms, since the crew moves all the furniture.

How Long Hardwood Installation Takes

The schedule depends on the square footage, the number of rooms and hallways, how much subfloor work turns up and whether old flooring has to come out first.

Acclimation is part of the timeline too. Industry guidelines treat it as a moisture target rather than a set number of days, so the wood goes down once its readings line up with your home and the subfloor.

The finish matters as well. We install prefinished boards, which come finished from the factory and are ready soon after they're down, with no on-site finishing to wait out.

What Affects the Cost of Hardwood Installation

Every estimate is free and based on your rooms, so the number reflects your job instead of a national average. These are the factors that move it most.

What moves the price

  • Square footage, plus how many rooms, closets and hallways the floor runs through
  • The species, grade and board width you choose
  • Removing and disposing of the old flooring
  • Subfloor repairs, like fastening loose panels or fixing low spots
  • Trim, transitions and the number of doorways

Laid Out Step by Step

Four steps from the first call to the final walkthrough.

  1. Free Estimate

    Call or send the form, and Bob measures your rooms and quotes the job himself, free of charge.

  2. Pick Your Floor

    Hardwood, vinyl plank or laminate, matched to the room, the foot traffic and the budget. You can also buy it yourself, which Bob prefers.

  3. Installation

    The crew moves the furniture, tears out and hauls away the old floor, preps and levels the subfloor and lays the new one.

  4. Final Walkthrough

    You walk the finished floor with the crew, and the job site is left clean.

Floored by the Details

5.0

From 11 reviews on Google

Read every review on Google

“Absolutely fantastic job! Quality Installs exceeded our expectations!

Excellent communication from management, very reasonable prices, professional, fast and clean work. Really pleased to have them doing our flooring project. Will definitely contact them in the future and recommend the company.”

Yosnina N., Google review
“Excellent work. The best out there.”
Patrick C., Google review for wood floor installation
“Installers were very professional, skilled, experienced, and cooperative! They gave good advice for my job and were flexible to meet my requirements.”
Chitra J., Google review

Questions Before We Start

Still have a question? Call (847) 361-0099.

Can Hardwood Go in a Basement?

Solid hardwood isn't suitable below grade, where moisture from the ground and the slab is a constant risk. Many vinyl plank products are approved for basements, and they come in convincing wood looks.

Is Engineered Hardwood the Same as Solid Hardwood?

No. Solid hardwood is one piece of wood all the way through, while engineered hardwood has a real wood top layer over a layered core, which makes it more stable where humidity swings. We install both.

What's the Best Hardwood for Dogs and Kids?

Harder species like hickory and white oak resist dents better than softer woods, and a matte or satin finish hides scratches better than a glossy one. Felt pads under furniture and a rug at each door help too.

How Do I Care for a New Hardwood Floor?

Sweep or vacuum often, wipe up spills right away and skip wet mops and steam cleaners. Keeping indoor humidity steady through Chicago winters also helps keep gaps from opening between boards.

Is the Installation Guaranteed?

Yes. Quality Installs backs every installation with a one-year guarantee. If something about the install doesn't look right in that first year, call us at (847) 361-0099.

Do You Install Hardwood on Stairs?

Yes. We install hardwood on stairs as well as floors, so the new look can carry up the staircase.

From the Blog

All flooring guides

Ready to Turn Your House Into a Home?

Tell us about your rooms and the look you're after, and we'll set up a free hardwood estimate. You can also call (847) 361-0099, Monday to Saturday.

(847) 361-0099
Hours
Monday to Saturday, 8 a.m. to 5 p.m.

Request a free estimate

Prefer to talk? Call (847) 361-0099.

Call NowFree Estimate